AL ADABIYA PORT

A B O U T

“It has the potential to be a gateway port for large volumes of Liquid and dry bulks.”

AL ADABIYA PORT is located in the upper part of the Gulf of Suez on the Red Sea on the Western coast of the Gulf of Suez at Latitude 29°52’ North and Longitude 32°29’ East, the entrance channel is 1.5 nautical mile long, 300-meter width, channel depth is 14 meter, 17 km from Suez City.

The port is considered one of the most vital ports handling liquid Bulk Cargo with an average of 1 million tons annually.

Due to the presence of tank storage facilities with the capacity of more than 300,000 tons (chemicals & edible oil). The biggest share of the port’s throughput is dry bulk, with an average handling exceeds 6 million tons annually.

The total throughput in the port reached 10 million tons annually (various cargo) in 2018/2019.

8 Berths with 1465 m total length and draft ranging from 9 to 14 m, the port area is 1,140,000 Mand able to receive dry bulk cargo vessels of up to 60,000 tons.

F E A U T R E S

Navigational Aspects

The location of the port provides natural protection for ships, so the port does not require any additional wave protection – all berths are open to the waters of the Suez Bay.

Services Provided

Cargo handling including stevedoring, warehousing, customs clearance and freight forwarding for the following types of cargo:

  • Containerized.
  • General Cargo.
  • Heavy and Project cargo.
  • Oils & Chemicals.
  • Dry bulk.
  • Liquid Bulk.
  • Live Stock.
  • Ship supply including bunkering, fresh water and purveyance.

Oil & Chemicals tank farms

  • Capacity: 260900 m³.

Warehouses / Storage area

  • Warehouses: 63000 m².
  • Open storage area: 63000 m².

C O N N E C T I V I T Y

Road Network

The port is directly connected to the national road M65 connecting North to South with M75 and M55 leading directly to Cairo. The total distance to Cairo is approximately 160 km.

Railway Network

There are 2 railway lines connecting the port – one leads to military berths and one to cargo port.

Development Projects

Dry Bulk Terminal

The dry bulk terminal project will begin operation by Al-Adabiya Co. The terminal is designated to have a total berth length of 770 m and a water depth of 14 m. The estimate annual handling cargo volume is 3.5m t. The terminal area is approx. 168,600 m².

Quay and Berth Rehabilitation

The project comprises several small measures to rehabilitate quays and berths aprons. In particular, the rehabilitation of the berth aprons (pavement) from berth 2 to berth 8 are part of this project as well as the quay edges of berths 2, 3, 4 and 5.

Logistics and Storage Area

This project features the construction of a logistics and storage area of approx. 160,680 m². This area is to be developed by Adabiya Marine Management Company. The project is implemented through BOT scheme of partnership.

New Service / Small Vessel Pier

This project holds the erection of a pier for service vessels and small vessels. The total berth length is 300 m and the water depth is 7 m. The adjoining yard is approx. 45,000 m².

Future Projects

Dry Bulk Terminal

The project covers the construction of an additional dry bulk terminal with a total quay wall length of 560 m. The water depth will be 14 m and the annual handling volume capacity will be approx. 5.5m t.

Multi-purpose Terminal

The planned construction of an additional multi-purpose terminal will have a berth length of approx. 500 m and a water depth at the quay wall of ca. 14 m.

Satellite AIS

L A Y O U T

This website uses cookies and asks for some related data to enhance your browsing experience, By continue browsing the website you are agreeing our use of cookies.